P15 · Research paper
Olympus — Rack AI Cluster
Overleaf-ready LaTeX source
PDF coming later
Compile this paper in Overleaf
- 1.Download the Overleaf ZIP above.
- 2.In Overleaf, choose New Project → Upload Project and select the ZIP.
- 3.Click Recompile, then download the generated PDF.
- 4.Name it
olympus-rack-ai-cluster.pdfand place it inpublic/papers/.
The paper is a standalone IEEE conference document: it already includes its document class, packages, title, abstract, sections, tables, and bibliography. No copy-and-paste is required.
Preview olympus-rack-ai-cluster.tex
\documentclass[conference]{IEEEtran}
\IEEEoverridecommandlockouts
\usepackage{cite}
\usepackage{amsmath,amssymb,amsfonts}
\usepackage{algorithmic}
\usepackage{graphicx}
\usepackage{textcomp}
\usepackage{xcolor}
\usepackage{hyperref}
\usepackage{booktabs}
\usepackage{array}
\usepackage{tabularx}
\newcolumntype{Y}{>{\raggedright\arraybackslash}X}
\hypersetup{hidelinks}
\begin{document}
\title{OLYMPUS Rack AI Cluster: An Evidence-Aware Architecture, Prototype Evaluation, and Integration Roadmap}
\author{\IEEEauthorblockN{Aaron Singh}
\IEEEauthorblockA{\textit{Department of Electrical and Computer Engineering} \\
\textit{San Francisco State University}}}
\maketitle
\begin{abstract}
This paper presents OLYMPUS Rack AI Cluster, a project in a twenty-project AI infrastructure portfolio. The current repository is an active prototype with implemented behavior, automated correctness tests, and explicit boundaries around unverified hardware or production claims. We describe the system model, current implementation, goals, and evaluation method, then propose five integrations that advance the project toward reproducible system-level validation. A local audit on August 14, 2026 executed 4 project tests successfully. No accelerator, deployment, or performance conclusion is inferred unless a corresponding committed benchmark or profiler artifact exists.
\end{abstract}
\begin{IEEEkeywords}
OLYMPUS, AI infrastructure, reproducibility, prototype validation, systems evaluation, hardware--software co-design
\end{IEEEkeywords}
\section{Introduction}
OLYMPUS Rack AI Cluster (P11) addresses a bounded problem within the portfolio's track-03-distributed-infrastructure track. Its declared status is \emph{Active Prototype} \cite{metadata}. The project validates its central mechanism before adding device-specific acceleration, production orchestration, or real-world hardware. This ordering matters because optimization without a trusted reference can make incorrect behavior appear successful.
The project goals are to establish deterministic behavior, encode correctness as tests, create machine-readable evidence, identify limiting resources through measurement, and integrate results with adjacent portfolio systems without losing provenance. The repository contains one paper named exactly after its singular folder: \texttt{P11-olympus-rack-ai-cluster.tex}.
\section{Technical Context}
Distributed inference depends on scheduling, capacity, communication, reliability, and observability. Later multi-node experiments must record topology, synchronization costs, retries, and tail latency. The portfolio benchmark standard requires environment, workload, method, metric, artifact, reproduction, and limitation fields; unknown values remain explicitly unmeasured \cite{benchmark}.
\section{System Model and Architecture}
The prototype is organized around the following domain model:
\begin{equation}
R_{max}=\min_j\left\lfloor\frac{C_j}{D_j}\right\rfloor
\end{equation}
The equation is a design and test abstraction rather than a claimed empirical law. It supports invariants and expected-value checks while later implementations replace synthetic inputs with representative workloads or devices.
The software architecture contains an input/configuration layer, a deterministic core, validation and evidence output, and a local visualization. The principal inspected source artifacts are \texttt{python/rack\_planner.py}. Unsupported real-world conditions are surfaced as limitations rather than silently simulated.
\section{Detailed Script Operation and Rationale}
The rack planner validates a JSON inventory, totals rack units, power, memory, and accelerators, then estimates pooled workload replica capacity from the limiting resource. It supports transparent capacity planning without presenting the result as a deployed rack.
The execution path is:
\begin{enumerate}
\item Load and structurally validate rack inventory JSON.
\item Check per-item rack-unit and resource requirements.
\item Aggregate rack units, power, memory, and accelerator totals.
\item Divide each pooled capacity by per-replica demand.
\item Report the minimum ratio as capacity and name the limiting resource.
\end{enumerate}
\begin{table*}[t]
\caption{Implementation artifacts and why they exist}
\label{tab:p11-implementation}
\centering
\small
\begin{tabularx}{\textwidth}{p{0.24\textwidth}YY}
\toprule
\textbf{Artifact} & \textbf{Observed responsibility} & \textbf{Engineering rationale} \\
\midrule
python/rack\_planner.py & ServerGroup, RackLimits, load\_inventory, summarize\_rack, estimate\_workload\_capacity, git\_value, main & Implements the inspectable, unit-tested project core. \\
scripts/reproduce.sh & Fixed test and demonstration entry point & Gives another developer one command for local reproduction. \\
PROJECT.yaml and ANALYSIS.md & Status, completed work, planned work, and claim boundaries & Separates declared intent from evidence-backed implementation. \\
streamlit\_app.py & Local evidence and status visualization & Makes outputs inspectable without upgrading simulation into a hardware claim. \\
\bottomrule
\end{tabularx}
\end{table*}
\section{Implemented Prototype}
The metadata and source audit found these completed features \cite{analysis}:
\begin{itemize}
\item Validated JSON rack inventory
\item Python rack-unit, power, memory, and accelerator totals
\item Pooled workload replica capacity calculation
\item Unit tests and machine-readable analysis output
\end{itemize}
On August 14, 2026, \texttt{python3 -m unittest discover -s tests -p 'test\_*.py'} completed successfully with 4 tests. The inspected test artifacts are \texttt{tests/unit/test\_rack\_planner.py}. This is evidence of local correctness for encoded cases, not production scale or hardware performance.
\section{Testing Methodology and Observed Results}
Testing uses Python's standard \texttt{unittest} discovery and exercises the public behavior of the reference implementation. The audit reran the suite from the project folder with \texttt{python3 -m unittest discover -s tests -p 'test\_*.py'}. All 4 discovered tests passed. The result establishes correctness only for the encoded local cases; it does not establish accelerator correctness, real-device behavior, production reliability, or benchmark completion.
\begin{table*}[t]
\caption{Audited test matrix}
\label{tab:p11-tests}
\centering
\scriptsize
\begin{tabularx}{\textwidth}{p{0.37\textwidth}Yp{0.21\textwidth}}
\toprule
\textbf{Test artifact and case} & \textbf{Behavior being checked} & \textbf{Observed result} \\
\midrule
tests/unit/test\_rack\_planner.py:test\_rack\_totals & Rack totals. & Pass (local, 2026-08-14) \\
tests/unit/test\_rack\_planner.py:test\_capacity\_identifies\_limiting\_resource & Capacity identifies limiting resource. & Pass (local, 2026-08-14) \\
tests/unit/test\_rack\_planner.py:test\_over\_limit\_inventory\_has\_zero\_capacity & Over limit inventory has zero capacity. & Pass (local, 2026-08-14) \\
tests/unit/test\_rack\_planner.py:test\_bad\_requirements\_are\_rejected & Bad requirements are rejected. & Pass (local, 2026-08-14) \\
\bottomrule
\end{tabularx}
\end{table*}
No numerical performance result is promoted by this test run. Where scripts emit JSON or JSONL, those outputs remain raw or simulation-specific until a reviewed summary includes hardware, software, workload, warm-up, repetition, correctness threshold, Git revision, and limitations.
\begin{table*}[t]
\caption{Declared status versus audited evidence}
\label{tab:p11-audit}
\centering
\small
\begin{tabularx}{\textwidth}{p{0.20\textwidth}Yp{0.25\textwidth}}
\toprule
\textbf{Audit field} & \textbf{Finding} & \textbf{Evidence source} \\
\midrule
Declared status & Active Prototype & PROJECT.yaml \\
Evidence-backed status & Active local prototype; 4 tests passed & Source plus local unittest run \\
Accepted measured results & None recorded in measured\_results & PROJECT.yaml \\
Mismatch / claim boundary & Capacity result is a pooled planning simulation, not a deployed rack & PROJECT.yaml and ANALYSIS.md \\
Next proof required & Per-node placement constraints; Cooling, redundancy, and network capacity model & Planned features \\
\bottomrule
\end{tabularx}
\end{table*}
\section{Claim Boundaries and Risks}
The project records these unverified or excluded claims:
\begin{itemize}
\item Capacity result is a pooled planning simulation, not a deployed rack
\end{itemize}
The main risk is confusing synthetic or modeled behavior with deployed-system behavior. Other risks include incomplete workloads, platform-dependent timing, missing failure injection, and interfaces not yet exercised across device boundaries. Performance claims require a reviewed record meeting the portfolio standard.
\section{Evaluation Plan}
Evaluation proceeds through correctness tests, deterministic reproduction with Git and environment metadata, repeated benchmarks reporting latency/throughput/memory/error metrics, and a named profiler capture tied to exact hardware and source revision. Success requires reference equivalence within a documented tolerance, preservation of safety and resource invariants, clear failures, and evidence reproducible from a clean environment.
\section{Goals, Milestones, and Success Criteria}
The project goals are staged so that correctness precedes performance and integration. A goal is complete only when its proof artifact is committed or otherwise reviewable; prose or a simulated number alone is insufficient.
\begin{table*}[t]
\caption{Project goals and required proof}
\label{tab:p11-goals}
\centering
\small
\begin{tabularx}{\textwidth}{p{0.06\textwidth}YY}
\toprule
\textbf{ID} & \textbf{Goal} & \textbf{Completion evidence} \\
\midrule
G1 & Per-node placement constraints & Passing tests and a reviewed source artifact \\
G2 & Cooling, redundancy, and network capacity model & Machine-readable result with reproduction metadata \\
G3 & Measured workload throughput inputs & Reference-equivalence or domain-correctness report \\
G4 & Add cooling, redundancy, and network constraints & Named profiler, deployment, or integration artifact \\
G5 & Drive placement from measured workload demand & Dashboard/report link preserving provenance and limitations \\
\bottomrule
\end{tabularx}
\end{table*}
\section{Future Work and Integrations}
The five project-specific next steps are:
\begin{enumerate}
\item Per-node placement constraints
\item Cooling, redundancy, and network capacity model
\item Measured workload throughput inputs
\item Generate deployment manifests and validate power, cooling, and network constraints.
\item Supply capacity to P10 and operational state to P20.
\end{enumerate}
The early items complete declared evidence; the later items connect downstream portfolio consumers. Each integration should add tests and a reviewable artifact such as JSONL evidence, a report, profiler capture, deployment manifest, trace, or labeled data set.
\section{Conclusion}
OLYMPUS Rack AI Cluster is an evidence-aware active prototype: its implemented behavior and tests are real, while unbuilt hardware, deployment, and performance goals remain labeled. Completing the five integrations in dependency order will advance it from a learning artifact toward a credible portfolio component.
\begin{thebibliography}{00}
\bibitem{metadata} Aaron Singh, ``OLYMPUS Rack AI Cluster PROJECT.yaml,'' local portfolio repository, updated 2026-08-13.
\bibitem{analysis} Aaron Singh, ``OLYMPUS Rack AI Cluster: README, ANALYSIS, source, and test artifacts,'' local portfolio repository, accessed Aug. 14, 2026.
\bibitem{benchmark} Aaron Singh, ``AI Infrastructure Portfolio Benchmark Standard,'' local portfolio repository, accessed Aug. 14, 2026.
\end{thebibliography}
\end{document}